Today was our first day of "shopping" for the house with our builder. It was intense to say the least, we went to about 4 seperate places between 9-1pm today and started to make the decisions for the things we will be looking at for a long time to come every day in our house!
We went to Blue Mountain Cabinets, or maybe its Blue Mountain Woodworking... anyway we went here first to go over the design of our kitchen and to pick our our cabinet styles. Styles as in look of the cabinets, color of stain (probably going with this stain called "honey" which is not pictured) and type of wood which is Maple. We did not pick the handles for the cabinets yet but I am guessing they will be black or brushed aluminum looking. We ended up adding some more counter room in the kitchen while we were there, since we needed to for the trash compactor, it didn't cost us anymore for this which is sweet. Were getting a 36" double cabinet under the dual layer island part of the kitchen with slide out racks to store our pots and such, exciting, I know. Were also going to get 1-2 glass faces on the corner cabinets, 2 lazy susan's and some other cool compartments and doodad's. I am pretty pumped up about the kitchen because I enjoy cooking, it relaxes me, same with Jess.

Second stop was the plumbing type store, faucets, tubs, toilets, oh my. I got to sit in our whirpool tub which is sick, its like 4' deep, its really deep, which is awesome and has 6 jets for my sore from minibike riding back and Jess's sore from cubicle working back. We picked out a really sweet thing for the kitchen sink which is just going to be Stainless Steel. For trading in an elongated toilet for a round toilet we got $150 credit and got some sweet handles and miniature hydrant type things for our master bathroom. A pedestal sink will be going into the powder room in exchange for a normal sink with small vanity, its pretty sweet. Our master bathroom tiled walk in shower is getting a sweet shower head + another one of those things thats on the big hose coming off the wall, so 2 watering devices in all in that one shower, cant wait for that thing to be done!






Next stop was the flooring store for basically everything except tile for the master bath and carpet we did not get to, we must be going to another place for the carpet or something. Flooring was super stressful, there is about 100 things that look almost the same, you have no idea exactly how its going to make the room look or how your stuff will look against it... we ended up picking out a few different samples we wanted for different parts of the house. We aren't really feeling the pergo as its just fake wood and we would prefer using Bamboo or that new cork flooring which I really liked so we might be able to get the Bamboo in a few spots (foyer or something) but not as much as we would like, oh well, I am happy for what we can have, its more than enough. Snaps will destroy it anyway.. and so will I haha

Stop 4 and the last place we made it to was the tile showroom. Tile will be going in our master bathroom on the floors, tiled shower, and tiled whirpool surround = sweet. I had this sweet orange mineral counter top picked out I wanted to use somewhere but I think I got outvoted. Were trying to go with some kind of earthy/slate kinda look in there I guess, just look at the pictures. One more note about the bathroom, were going to get heating floors, its only like $300-400 with digital controller!


In conclusion today was fun but sort of rushed, we did not make too many final decisions, maybe like 3-5 things total are final and everything else is kinda just up in the air for us to think about over the next few days. I was also waiting to hear back from Kevin Benner today on our mortgage because we thought interest rates may drop overnight, but could not reach him today.
One more good thing that happened today in our quest for home ownership is our septic design was approved and our permit was issued!! The only things left before we can break ground is finalize the bank stuff, get the grading plan signed off on (this is in progress since Feb 19th) and then the building permit will be in for hopefully a March start.
<a href="http://www.hypersmash.com/hostgator/" id="EK09991917">HostGator coupon</a>








